GRID FREQ 49.98 HzNR TOTAL DEMAND 1,497 MWPEAK FORECAST 1,612 MW @ 19:15SOLAR GEN 268 MWCO₂ AVOIDED TODAY 4,210 tPOWER FACTOR 0.96ACTIVE ALARMS 7GRID HEALTH INDEX 94.2REGEN ENERGY RECOVERED 142 MWhOPEN WORK ORDERS 23GRID FREQ 49.98 HzNR TOTAL DEMAND 1,497 MWPEAK FORECAST 1,612 MW @ 19:15SOLAR GEN 268 MWCO₂ AVOIDED TODAY 4,210 tPOWER FACTOR 0.96ACTIVE ALARMS 7GRID HEALTH INDEX 94.2REGEN ENERGY RECOVERED 142 MWhOPEN WORK ORDERS 23
Total Demand
1,497
MW
Scheduled 1,512 MW
1.0%
Grid Frequency
49.98
Hz
Nominal 50.00
0.0%
Renewable Gen
275
MW
18.4% of mix
6.2%
Power Factor
0.96
Target ≥ 0.95
0.8%
CO₂ Avoided
4,210
t
Today · vs baseline
12.4%
Grid Health Idx
94.2
7 active alarms
0.6%
AI Demand Forecast · 24h

Actual vs Forecast Load · Renewable Coverage

Actual
Forecast (LSTM)
Renewable
Next 15 min
1,512 MW
+1.0%
Next 1 hour
1,548 MW
+3.4%
Next 24 hrs peak
1,612 MW
19:15
Next 7 days peak
1,684 MW
Mon 19:30
Energy Mix · Live

Source Composition

● UPDATING
Renewable share
38%
Target 50% by 2030
Grid Import
62%
Solar
18%
Wind
7%
BESS
4%
Regen Braking
9%
GIS Network

Northern Railway · Electrical Topology

DLI
412 MW
UMB
286 MW
FZR
198 MW
LKO
354 MW
MB
247 MW
Healthy
Warning
Critical
Traction Substation
critical
Kanpur TSS
TSS-LKO-02 · Div LKO
Loading
94%
Voltage
25.2 kV
PF
0.94
Feeders
6 / 6
AI Anomaly Detection

Active Events

7 ACTIVE
Demand Spike
12:42
TSS-LKO-02 Kanpur
+38% over forecast band
Power Factor Drop
12:18
Feeder F-DLI-14
PF 0.78 < threshold 0.92
Transformer Temp
11:55
TR-FZR-LDH-2
Top oil 78°C trending up
Possible Theft
11:31
Meter M-UMB-2210
Reverse current detected
Harmonic Distortion
10:48
SSP Saharanpur
THD 6.2% — within limit
Energy Accounting

Top Consuming Stations · MTD

Unit: MWh
01
New Delhi · DLI
4,8204.2%
02
Charbagh Lucknow · LKO
3,9101.8%
03
Kanpur Central · LKO
3,7806.1%
04
Ghaziabad · DLI
3,2102.4%
05
Moradabad Jn · MB
2,9800.6%
06
Ambala Cantt · UMB
2,7401.9%
07
Ludhiana Jn · FZR
2,5103.3%
08
Bareilly Jn · MB
2,1802.1%
Predictive Maintenance

AI-Generated Work Orders

Contact resistance check
WO-9921 · CB-DLI-NDL-7
High
Due Jun 13AI confidence 94%
DGA oil sampling
WO-9920 · TR-LKO-CB-1
Medium
Due Jun 14AI confidence 81%
Switching relay replace
WO-9919 · Cap Bank C-MB-3
Medium
Due Jun 15AI confidence 76%
Firmware upgrade
WO-9918 · Relay R-FZR-LDH-12
Low
Due Jun 18AI confidence 68%
Renewables · Solar

Generation Profile

Output
187 MW
PR
84.6%
BESS SOC
68%
Inverter η
97.1%
RailEMS Assistant
GPT · LSTM · Asset Graph · EN / HI
ONLINE
Good afternoon, R. Kapoor. NR demand is tracking 1.0% below schedule. I'm watching a thermal anomaly at TR-LKO-CB-1 and Kanpur TSS is at 94% loading — would you like a load-shed simulation?
Optimization Engine

Today's Recommendations

Est. Savings
₹11.9 L
Shift 42 MW load from 19:00–20:00
Delhi Division
₹6.8 L/dayconf 91%
Discharge BESS Bay-3 at 18:45
Lucknow Division
₹3.2 L/dayconf 87%
Switch Capacitor Bank C-MB-3
Moradabad Division
₹1.9 L/day · PF +0.04conf 95%
Compliance & Security

Posture

ISO 27001:2022Certified
CERT-In GuidelinesCompliant
IR Cyber Std v3.1Compliant
MFA Coverage98.4% users
Audit Log Retention365 days
Disaster RecoveryRPO 5m · RTO 15m
SIEM Events / 24h1.24 M ingested